VERDE OFFICE BUILDING COMPLEX

Address: ROBERTA HIRŠA IELA 1, RIGA
Client: SIA HANZA 14
General contractor: SIA VELVE
Сonstruction period: NOVEMBER 2020 — OCTOBER 2023
100% Complete

The total development area of the Verde office building complex is 6140 m2. Construction is to be completed in November 2023. The floor area will reach 40,418.4 m2, providing an area for more than 2000 workspaces. The underground car park will accommodate up to 395 vehicles. The complex has received a certificate with a BREEAM Excellent rating, and will be built in compliance with BREEAM construction and environmental protection requirements. The complex will be equipped with a best-in-its-class heating and ventilation system, smart energy control, energy efficiency class A, and will almost meet the standard of a zero-energy building. There are plans to set up public pedestrian and bicycle paths, outdoor workspaces and terraces, as well as roof gardens and greenery on wall panels and indoors. Innovative utility systems will be used as part of the project, with raised floors and a modern cooling tower system.


LLC (SIA) “Velve” has fully constructed the first building called building A of “Verde” and put it into service in July 2022. Along with this, up to October 2023, LLC (SIA) “Velve” has also finished construction of the load bearing constructions of building B, commenced facade assembly and completed part of the interior and exterior engineering works.

CONSTRUCTION OF ZEISS OFFICE BUILDING AT MŪKUSALAS IELA 41E

Address: MŪKUSALAS IELA 41E, RIGA
Client: MŪKUSALA BUSINESS CENTRE
General contractor: SIA VELVE
Сonstruction period: MAY 2021 — SEPTEMBER 2023
100% Complete

The total development area of the Zeiss office building is 1171 m². As part of the project, SIA Velve will construct a new office building, and will manage and monitor the structures next to the construction site. The buildings will be constructed in compliance with the BREEAM (Building Research Establishment Environmental Assessment Method) requirements pertaining to construction and protection of the environment. The new office building is to be commissioned in September 2023.

Rebuilding of the BAS ‘Daugavgrīva’ waste water secondary settlement sump

Address: BAS ‘Daugavgrīva’, Dzintara iela 60, Riga
Client: SIA ‘Rīgas ūdens’
General contractor: SIA VELVE
Сonstruction period: 14.11.2022.-21.10.2023
100% Complete

SIA ‘Velve’ will renovate the secondary settlement sump, dismantle the current equipment, including the removal of the central column and upper layers of concrete from the walls and the floor. The company also intends to prepare the cleared settlement sump, to build a new column, renovate the concrete surface, the reinforced concrete duct for the mud mixture, the steel pipelines and the utility lines connected to it, and to install and configure the necessary production equipment.


At the moment, the construction site of the object has been set up and the dismantling of the metal structures has been started.

REBUILDING OF WASTEWATER PRIMARY SEDIMENTATION TANKS AT THE BIOLOGICAL TREATMENT PLANT “DAUGAVGRĪVA”

Address: 60 DZINTARA STREET, RIGA
Client: SIA RĪGAS ŪDENS
General contractor: SIA VELVE
Сonstruction period: ONE YEAR
100% Complete

LLC (SIA) “VELVE” will perform the renovation of both primary sedimentation tanks at the biological treatment plant “Daugavgrīva”. During the implementation of the project, the current equipment will be dismantled, as well as the central column and top concrete layer of the reservoir walls and floors. Dismantling will be followed by preparation of the decontaminated sedimentation tanks. Renovation works will include construction of the new column, renovation of concrete decks, rebuilding of the sludge mixture reinforced concrete channels, steel pipelines and supplying networks, as well as rebuilding of the sludge suction hose and floating matter (grease) pipeline. The LLC (SIA) “VELVE” will also install and adjust the required technological equipment.

EXPANSION OF WATER AND SEWER LINES IN BERĢI

Address: Rijas/Zanes/Gatiņa/Baibas/Ulža/Tota/Leldes/Berģu/Brīvības iela
Client: SIA RĪGAS ŪDENS
General contractor: SIA BINDERS
Сonstruction period: 12 January 2021 to 23 February 2022
100% Complete

The expansion of water and sewer lines in Berģi is to be completed on 23 February 2022. The purpose of the project is to improve the quality of water and sewer services in the Berģi neighbourhood. Furthermore, the project will include earth, road and field work, as well as the installation of water supply and sewer facilities.

DEPLOYMENT OF A BIODEGRADABLE WASTE RECYCLING FACILITY AT THE ‘GETLIŅI’ HOUSEHOLD WASTE SITE

Address: KAUDZĪŠU IELA 57, RUMBULA, STOPIŅI MUNICIPALITY
Client: SIA GETLIŅI EKO
General contractor: PS MRKV
Сonstruction period: 8 OCTOBER 2018 — 7 JANUARY 2022
100% Complete

The design size of the site is 64,151 m2, including a construction development area of 15,264 m2, as well as road and open areas amounting to a total of 21,580 m2. SIA Velve conducts the following work: all design work was carried out by March 2020, and designer supervision began; most of the earthworks and the construction of the biological pump station foundation and building 3 of the temporary biological waste storage facility have been completed; the work on constructing the roads and open areas, the utility and equipment building, the bioreactor and biomass tunnel building, the recycling bulk material sorting building, water supply, power supply and sewer lines continues.

RENOVATION OF THE BAS ‘DAUGAVGRĪVA’ WASTE WATER SECONDARY SETTLEMENT SUMP

Address: BAS ‘DAUGAVGRĪVA’, DZINTARA IELA 60, RIGA
Client: SIA ‘RĪGAS ŪDENS’
General contractor: SIA VELVE
Сonstruction period: 28.09.2020 to 27.09.2021.
100% Complete

Total area of the site: 1334.38 sq. m. The renovation of the BAS ‘Daugavgrīva’ waste water secondary settlement sump began on 28 September 2020, and will continue until 27 September 2021. SIA Velve will renovate the secondary settlement sump, dismantle the current equipment, including the removal of the central column and upper layers of concrete from the walls and the floor. The company also intends to prepare the cleared settlement sump, to build a new column, renovate the concrete surface, the reinforced concrete duct for the mud mixture, the steel pipelines and the utility lines connected to it, and to install and configure the necessary production equipment.

RECONSTRUCTION OF CANTEEN AND LIBRARY BUILDINGS NO. 01000850230001 AND 01000850229006 (ERDF) AT EZERMALAS IELA 6A AND 6B, IN RIGA

Address: EZERMALAS IELA 6A, 6B, RIGA
Client: NATIONAL MILITARY DEFENCE SITE AND PROCUREMENT CENTRE
General contractor: SIA VELVE
Сonstruction period: 16 September 2020 to 16 September 2021
100% Complete

The total area to be improved as part of the project is 9569 m2, including 1988 m2 of the library, and 3177 m2 of the canteen. Two buildings will be rebuilt: the library (No. 006) and the canteen (No. 001). Load-bearing structures and road paving will have to be replaced in some areas. Heat insulation will be installed on the facades of the buildings, finished with fibre cement cladding. SIA Velve will also install the utility lines (power supply, heating, ventilation, water, sewer, electronic communications), and deliver and install the production equipment in the kitchen.

RENOVATION OF THE FACADE OF THE LATVIAN WAR MUSEUM BUILDING AND TOWER

Address: SMILŠU IELA 20, RIGA
Client: NATIONAL MILITARY DEFENCE SITE AND PROCUREMENT CENTRE
General contractor: SIA VELVE
Сonstruction period: 15 September 2020 to 15 September 2021
100% Complete

The work will begin on 15 September 2020, and will take 12 months to complete. The total area of the site is 1400 sq. m. SIA Velve has signed the contract with the client, and is preparing for beginning the work, in order to replace the roofing on the building and the tower of the Latvian War Museum, to renovate its facades, restore doors and windows, to improve the grounds of the museum and to install various utility lines within the time specified in the contract.

NEW JAUNMĀRUPE DAY-CARE FACILITY FOR CHILDREN

Address: OZOLU IELA 2, JAUNMĀRUPE, MĀRUPE MUNICIPALITY
Client: MĀRUPE MUNICIPAL COUNCIL
General contractor: SIA VELVE
Сonstruction period: JUNE 2020 to AUGUST 2021
100% Complete

The total area of the site is 3.4 ha, with the floor area of the building being 5503 m2.


The work began on 2 July 2020, and currently, the company is setting up the construction site, and installing the water supply and sewer systems. SIA Velve will then proceed to the earthworks, the dismantling of the current utility systems, the installation of new outdoor utilities (water, sewer and power supply lines), the concreting, the assembly of metal structures, prefab reinforced concrete structures, and various external structures, the interior finishing in the building, the development of the outdoor premises, and the construction of an access road and car park.

DEPO WAREHOUSE STORE AT KURZEMES PROSPEKTS IN RIGA

Address: KURZEMES PROSPEKTS 3B, RIGA
Client: SIA PĀRUPES BŪMAŅI
General contractor: SIA VELVE
Сonstruction period: NOVEMBER 2019 — DECEMBER 2020 (PLANNED)
100% Complete

The total area of the project is 33,266 m², with the total floor area of the building being 17,377.4 m2. SIA Velve conducts the following work: demolition of the underground portion of the bunker, earthworks, construction of the water supply/sewer lines for ‘Rīgas ūdens’ outside the site (including the microtunnels and sewer drains), construction of the on-site water supply/sewer lines, installation of foundation piles, concreting of the foundation frame, assembly and installation of load-bearing pre-fab reinforced concrete and metal structures, installation of joists and roofing, construction of glazed aluminium structures, construction of external sandwich panel walls, construction of indoor utilities, seamless concreting of floors, construction of a central heating line, general construction work, construction of street and internal paved roads, and general improvement of the outdoor premises.

HOFT Reconstruction of the building and a construction project for the residential building

Address: 5 Strēlnieku Street, Riga
Client: “R.EVOLUTION 21” LTD.
General contractor: SIA VELVE
Сonstruction period: December 2017 - November 2020
Total area of the object: 8337 m2
100% Complete

In the HOFT project (House of the Flying Trees), VELVE will reconstruct the building at 5 Strēlnieku Street, by reinforcing the existing structures of the building and by building two additional fully glazed floors over the restored facades. Both the glass floor and the courtyard of the building will have specially designed containers and terraces with a variety of conifers - cedar, mountain pine - as well as various Bonsai trees. A new building with seven ground floors and two-storey underground parking will also be built within the project. The HOFT project combines historic architecture with modern solutions, exclusive finishing materials and natural elements. It will be a unique project, where elements of nature, art and design will play a leading role.

NEW LABORATORY BUILDINGS FOR RIGA CLASSICAL GYMNASIUM

Address: 38 PURVCIEMA STREET, RIGA
Client: RIGA CITY COUNCIL PROPERTY DEPARTMENT
General contractor: SIA VELVE
Сonstruction period: JULY 2018 - AUGUST 2020
100% Complete

The four-floor laboratory building of the Riga Classical Gymnasium with a total area of approximately 2,700 square metres will house ten laboratories and ancillary rooms used for chemistry, physics, biology, robotics and computer science lessons. Meanwhile the semi-basement floor will house a lecture hall and ancillary rooms for 160 persons. It will also be suited for non-school activities by being functionally separated from the other premises. The new building will also house a reading room, book storage, library, cloakroom, working rooms for teachers, various ancillary premises and bathrooms on all floors. All rooms and the lecture hall will feature the equipment needed for the teachers’ work.

RECONSTRUCTION OF RIGA ZOLITŪDE GYMNASIUM – NEW LABORATORY BUILDINGS

Address: 22 RUSES STREET, RIGA
Client: RIGA CITY COUNCIL PROPERTY DEPARTMENT
General contractor: SIA VELVE
Сonstruction period: 23 JULY 2019 — 26 AUGUST 2020
100% Complete

Construction area of four floors is 958 m2, and the total area is 3160 m2. The pouring of monolithic concrete structures and assembly of prefabricated reinforced concrete structures has now been completed. At the semi-basement level, there are plans for a lecture hall for 160 persons that may also be used for non-school activities by being functionally separated from the other premises with suitable bathroom facilities. This level also includes a cloakroom for the entire number of students of the new building and a library book storage. The first floor will contain two lecture halls (IT/robotics laboratories) with the possibility to join them into one. A library reading room, conference hall and teachers’ room with work and rest areas is also planned. The second and third floor will house four classrooms (physics, natural sciences, chemistry and biology laboratories) with the possibility to merge two of them. The main HVAC technical room serving floors from 1 to 3 will be located on the roof. All facilities are to be designed taking the convenience for children into account, including the selection of furniture and adaptation of various surfaces, such as window sills, for sitting.

CONSTRUCTION OF AN OFFICE BUILDING, AUXILIARY BUILDING AND BOILER HOUSE

Address: LEJUPES IELA 1C and LEJUPES IELA 3, RIGA
Client: INSTITUTE OF FOOD SAFETY, ANIMAL HEALTH AND ENVIRONMENT ‘BIOR’
General contractor: SIA VELVE
Сonstruction period: 29 JULY 2019 — JULY 2020
100% Complete

As part of the construction, it is planned to erect the new building, including the laboratory and connecting routes over an area of more than 1500 m2, and to demolish the old boiler house, constructing a new, more powerful one. A new technology never before used in Latvia will be the building’s facade coated with a composite-printed mesh. The utility lines will also be rearranged on the premises, with an additional sewer pumping station.

HYDROGEN FILLING STATION IN RIGA, AT VIENĪBAS GATVE

HYDROGEN FILLING STATION IN RIGA, AT VIENĪBAS GATVE

Address: VIENĪBAS GATVE 6 12, RIGA
Client: RP SIA RĪGAS SATIKSME
General contractor: PA HYDROGENIS – VELVE
Сonstruction period: 6 APRIL 2017–30 JUNE 2020
100% Complete

The design size of the site is 7578 m2, including a construction development area of 452.88 m2, as well as road and open areas amounting to a total of 1016 m2. SIA Velve, in conjunction with SIA Hydrogenis, carried out the following work: engineering, construction of the building structures and the hydrogen filling station, including the installation of 3 hydrogen generation modules, a water and air treatment module, a control room, a gas compressor module, and a cooling unit. Furthermore, the project involved the installation of hydrogen storage tanks, a station module coordinating the feed of hydrogen, and two filling units: one for cars, and the other, for heavy vehicles. A main hydrogen line was built to deliver hydrogen from the filling station to the filling units.

RECONSTRUCTION OF RIGA STRADINS UNIVERSITY HITORICAL STABLE INTO A MUSEUM BUILDING

Address: 9 KRONVALDA BULVĀRIS, RIGA
Client: RIGA STRADINS UNIVERSITY
General contractor: SIA VELVE
Сonstruction period: JULY 2018 – JUNE 2020
Total area of the object: 671.2 M2
100% Complete

Within the works VELVE will carry out the reconstruction of the historic stable building, the entrance hall to the museum with a reception will be constructed, as well as an extension, spacious front yard, access driveways, a car park and bicycle parking area. The former stables are intended to be retained as the main volume, as well as it is planned to reconstruct the historic windows, walls, capitals. Within the reconstruction it is planned to dismantle all the internal load-bearing walls in order to create the largest possible museum space that will be connected to the new extensions. It is planned to expand the basement under the entire historical building, freeing up space for the storage and technical premises of the museum. To combine the new volumes with the detailed historical coverage, it is planned to produce aluminium-glass profile finishing that will also serve as outdoor blinds. Such solution has been used to achieve as transparent a visual design as possible, at the same time protecting the building from overheating and the museum exhibits from excessive natural light.

DISMANTLING OF THE EXISTING BOILERS AND THEIR PIPEWORK SYSTEM; INSTALLING OF BIOFUEL WATER HEATING BOILERS WITH A CAPACITY OF 2X4 MW AT HP “DAUGAVGRĪVA”

Address: 4 LĒPJU STREET, RIGA
Client: AS “RĪGAS SILTUMS”
General contractor: AS “LAFIPA”
Сonstruction period: 5 APRIL 2019 — MAY 2020
100% Complete

Two stages are planned within the construction process. The first – the dismantling of the existing boilers and their pipework system – was completed on 19 July 2019. This stage involved the demolishing works and utilisation of the hazardous waste (materials containing asbestos) at the heating plant “Daugavgrīva” owned by JSC “Rīgas Siltums”. The second construction stage – installing of biofuel water heating boilers with a capacity of 2X4 MW – was begun on 1 August 2019. Within it the renovation of the existing heating plant is planned, as well as the construction of the new woodchip warehouse and the construction of the external engineering networks.

RECONSTRUCTION OF THE LATVIAN ENVIRONMENT, GEOLOGY AND METEOROLOGY CENTRE BUILDING

RECONSTRUCTION OF THE LATVIAN ENVIRONMENT, GEOLOGY AND METEOROLOGY CENTRE BUILDING

Address: 165 MASKAVAS STREET, RIGA
Client: VSIA “LATVIJAS VIDES, ĢEOLOĢIJAS UN METEOROLOĢIJAS CENTRS”
General contractor: SIA VELVE
Сonstruction period: JUNE 2018 – APRIL 2020
Total area of the object: 7095.4 M2
100% Complete

Within the project VELVE carries out construction, design and author supervision. In the construction process the reconstruction of the facade, the reconstruction of the interior premises and the construction of the laboratory are planned. Currently the dismantling works are implemented within the project. Floors have been constructed on 4 storeys, as well as the replacement of windows and the construction of plasterboard has begun.

THREE INTERCONNECTED SOCIAL RESIDENTIAL BUILDINGS WITH THE TERRITORIAL CENTRE, DAY CENTRE AND HEALTH CENTRE OF THE RIGA SOCIAL SERVICE AT 43 MEZROZĪSU STREET, RIGA

Address: 43 MEŽROZĪŠU STREET, RIGA
Client: SIA “RĪGAS PILSĒTBŪVNIEKS”
General contractor: Velve
Сonstruction period: DECEMBER 2016 – MARCH 2020
Total area of the object: 12 872 M2
100% Complete

Within the implementation of the construction design “Three interconnected social residential buildings with the Territorial Centre, Day Centre and Health Centre of Riga Social Services at 43 Mezrozīšu Street, Riga”, the construction of the new building complex has begun, where 218 apartments for various social groups will be constructed, of which ~70 apartments have been designed according to environmental accessibility requirements, as well as three public structural units – the Territorial Centre, Day Centre and Riga Health Centre of Riga Social Service, that will provide the residents of Bolderāja with social assistance and health care. The buildings at Mežrozīšu Street are constructed next to 4 rental residential buildings already owned by Riga City Council and constructed in 2014. There are 2 more social and one municipal rental building right there. The apartments will mostly have one room in the space of 18 to 20 square metres, because these are the most demanded. The total number of apartments – 218, of which: 149 are social apartments and 69 are service apartments. 69 service apartments or apartments for people with special needs of which: 45 are one-room service apartments, 21 two-room service apartments, 3 three-room service apartments. 149 are social apartments, of which 16 will be two-room apartments, the other (133) – one-room apartments. There will be a children’s playground in the courtyard of the building complex, as well as a recreation and relaxation area suitable for groups of residents of different ages. A garden will be facilitated for the health centre, and the courtyard will be enclosed from the rest of the site with a fence. Also, in the facilitation area, parking spaces will be constructed for 96 cars, including parking spaces according to environmental accessibility requirements. Currently works have been initiated, the foundations of the building have been laid and the concreting of the structures has been initiated, as well as the construction of external engineering communications will be begun in the near future.

RECONSTRUCTION OF OFFICE BUILDINGS, INCL. RECONSTRUCTION OF EXTERNAL ENGINEERING NETWORKS

Address: 52, 52A AND 50A SKANSTES STREET
Client: AS “SWH GRUPA”
General contractor: SIA VELVE
Сonstruction period: OCTOBER 2017 – SEPTEMBER 2019
Total area of the object: 16 272.52 M2
100% Complete

VELVE will implement the reconstruction and rebuilding of the existing office buildings, by providing the reconstruction of the external engineering networks, which includes rainwater and domestic sewerage systems, water supply, power and low-voltage networks. During the reconstruction of the buildings, the construction of piles and micropiles will take place, which is necessary for the functionality of the new layout. VELVE will also carry out the facade works of buildings, the assembly of windows that meet modern requirements, as well as the rebuilding of the last two storeys and the roof. Reinforcing concrete and metal works and finishing of the common areas will also be implemented in the premises of the building. Within the project VELVE will provide the dismantling of midsections of two buildings and the construction of new buildings. All internal networks will be reconstructed in the buildings.

Rebuilding of the BAS ‘Daugavgrīva’ waste water secondary settlement sump

Rebuilding of the BAS ‘Daugavgrīva’ waste water secondary settlement sump

Address: BAS ‘Daugavgrīva’, Dzintara iela 60, Riga
Client: SIA ‘Rīgas ūdens’
General contractor: “VELVE” LTD
Сonstruction period: 28.09.2017–08.07.2019
100% Complete

VELVE carried out the rebuilding of the BAS ‘Daugavgrīva’ waste water secondary settlement sump, which included the dismantling of equipment and the central column, and the removal of the concrete surface layer from the walls and the floor. New columns were built, a new concrete surface and all the utility lines were laid, the current reinforced concrete duct and steel pipeline were renovated; stainless steel structures and the corresponding equipment were installed.

Reconstruction of the administrative building in Tukums at 16 Pils street

Reconstruction of the administrative building in Tukums at 16 Pils street

Address: 16 Pils street, Tukums
Client: State JSC “Tiesu Nama Aģentūra”
General contractor: GP Velve and Campaign – Velve builds, Campaign designs.
Сonstruction period: 20 January 2017 – June 2019
Total area of the object: 1149.2 m2 (556 m2 new construction, 593.2 m2 reconstruction)
Contract sum: 1 918 861 EUR
100% Complete

In this project, VELVE will carry out 3D design works on the BIM platform, reconstruct the old building and provide construction works of the new building of the Tukums District Court. The existing court facilities do not match the actual number of employees as well as they need to be upgraded, providing a modern and comfortable environment for visitors and employees. Within the framework of the project, the premises will be adapted in accordance with the specifics of the court work, providing the parts of both closed and public spaces. In the project of court building development, it is planned to repair and renovate the existing premises as well as to expand the total area of premises to 1500 square meters.

ADMINISTRATIVE BUILDINGS AND WAREHOUSE BUILDING WITH PRODUCTION PREMISES

ADMINISTRATIVE BUILDINGS AND WAREHOUSE BUILDING WITH PRODUCTION PREMISES

Address: “NORUPES”, TĪNŪŽU PARISH, IKŠĶILES DISTRICT
Client: SIA “RĪGAS MEŽI”
General contractor: SIA Velve
Сonstruction period: JULY 2018 – MAY 2019
Total area of the object: 11 706 M2
100% Complete

Within the project VELVE will carry out the designing and construction works of the administrative building and warehouse building with the premises of the production workshop. In the construction of the administrative building Fibo blocks will be used, but the finishing of the external wall is planned to be wooden boards of various shades and width arranged in alternating directions, emphasising the staircase with vertical systems of wood and glazing. The windows and the exterior doors are made of wood with glass packets. Roof covering – bituminous roll material. The visual solution and shading of the warehouse building is analogue to the sandwich panel building in the adjacent area. Within the framework of the project appropriate measures of environmental protection are taken.

MULTI-FUNCTIONAL NEW BUILDING “VILLA MILIA”

Address: 21 DZINTARU PROSPEKTS, JŪRMALA
Client: SIA “DZINTARU 25”
General contractor: SIA VELVE
Сonstruction period: NOVEMBER 2017 – MARCH 2019
100% Complete

Within the project VELVE provides the construction works. The required engineering networks will be constructed in the building, as well as facilitation works of the territory will be provided, which also includes the installing of architectural elements. Villa Milia is the modern version of the well-known Villa Benjamina in Jūrmala, dedicated to the memory of Emīlija Benjamiņa, who was a respected influencer of public life and history in Latvia in the 20s and 30s of the last century.

THE CONSTRUCTION OF TRADE CENTRE “DEPO” IN KAUNAS

THE CONSTRUCTION OF TRADE CENTRE “DEPO” IN KAUNAS

Address: 8 VAKARINIS APLINKELIS, KAUNAS
Client: UAB “KAUNO BUMANI”
General contractor: SIA VELVE
Сonstruction period: APRIL 2018 – JANUARY 2019
Total area of the object: 22 752.88 M2
100% Complete

Within the project VELVE is providing the construction works of the shopping centre and the surrounding territory. The planned commercial premises together with the complex of the administrative premises form an area of 22 753 m2, while the facilitation works of the territory and infrastructure are planned in an area of 55 991 m2. VELVE provides full implementation of the project – from earthworks, the construction of piles and grillages, masonry, roof, facade finishing and interior works, to the laying of asphalt surfacing for the construction of the traffic tunnel and advertising pylon.

CONSTRUCTION OF TRADE CENTRE “DEPO” IN VILNIUS

CONSTRUCTION OF TRADE CENTRE “DEPO” IN VILNIUS

Address: 373 UKMERGES GATVE, VILNIUS
Client: UAB “JUNBUMANI”
General contractor: SIA VELVE
Сonstruction period: OCTOBER 2017 – JANUARY 2019
Total area of the object: 21 232 M2
100% Complete

Within the project VELVE is providing the construction works of the shopping centre and the surrounding territory. The planned commercial premises together with the complex of the administrative premises form an area of 21 232 m2, while the facilitation works of the territory and infrastructure are planned in an area of 44 780 m2. VELVE provides full implementation of the project – from earthworks, the construction of piles and grillages, masonry, roof, facade finishing and interior works, to the laying of asphalt surfacing for the construction of the traffic tunnel and advertising pylon.

RECONSTRUCTION OF BAS “DAUGAVGRĪVA” INITIAL SETTLERS OF WASTE WATER

RECONSTRUCTION OF BAS “DAUGAVGRĪVA” INITIAL SETTLERS OF WASTE WATER

Address: BAS “DAUGAVGRĪVA”, 60 DZINTARA STREET, RIGA
Client: SIA “RĪGAS ŪDENS”
General contractor: SIA VELVE
Сonstruction period: NOVEMBER 2017 – NOVEMBER 2018
100% Complete

VELVE implements the reconstruction of two initial settlers of waste water at BAS “Daugavgrīva”, by dismantling the existing equipment and the central column, as well as by removing the concrete upper layer from the walls and floors. The cleaned area is being prepared and construction of a new column is under progress. The concrete layers will be restored.

Construction of water supply and sewerage networks and reconstruction of Rubenu and Akmenu streets in the Raubeni village of Cenas parish (I, II stage)

Address: Rubenu street, Akmenu street, Raubeni village, Cenas parish, Ozolnieki region
Client: Ozolnieki County Council
General contractor: SIA VELVE
Сonstruction period: 26 June 2017 – 25 October 2018
Total area of the object: 23 304m2
Contract sum: 1 687 911 EUR
100% Complete

Within the framework of the project, VELVE will carry out the construction of storm drainage, as well as water supply and sewerage systems. Street lighting will be arranged. The works on the preparation of the base and asphalting will also be performed. The project is separated in 2 stages:

• 1st stage (2017): 12 897 m2 road; water pipes 1405 m; sewerage 1369 m.

• 2nd stage (2018): 10 407 m2 road; water pipes 1197 m; sewerage 1055 m.

TERRITORIES USED BY MEZCIEMS ELEMENTARY SCHOOL AND RIGA SECONDARY SCHOOL No. 89

TERRITORIES USED BY MEZCIEMS ELEMENTARY SCHOOL AND RIGA SECONDARY SCHOOL No. 89

Address: 27/29 HIPOKRĀTA STREET, RIGA
Client: RIGA CITY COUNCIL PROPERTY DEPARTMENT
General contractor: SIA VELVE
Сonstruction period: APRIL 2018 – SEPTEMBER 2018
100% Complete

VELVE provided the following facilitation works of the territory: construction of football field with artificial turf, multifunctional, gymnastics and playground area with soft synthetic surfacing and equipment, runways, long jump sector with synthetic rubber surfacing, multifunctional cycle track, paving and other facilitation works.

NEW WAREHOUSE BUILDING WITH PRODUCTION PREMISES AND OFFICE PREMISES AND DEMOLITION OF THE EXISTING BUILDING

NEW WAREHOUSE BUILDING WITH PRODUCTION PREMISES AND OFFICE PREMISES AND DEMOLITION OF THE EXISTING BUILDING

Address: 1 BUKAIŠU STREET, RIGA
Client: SIA “AMALVA BALTIJA”
General contractor: SIA VELVE
Сonstruction period: JUNE 2016 – JULY 2018
100% Complete

One year ago the team of Velve started work at the company Amalva Baltija, one the largest plants of Komfovent production in the Baltics! In October 2017 we immured a capsule in the building foundations, but now we are proud to successfully commission the project for use! At the new Komfovent production plant, valves of three different fire-safety classes will be produced using only certified materials with declarations of conformity. Within the works dismantling, crushing and utilisation of the old plant structures was carried out. The new building was constructed of prefabricated reinforced concrete, producing the panels of the covering beams at the Lithuanian reinforced concrete plant “AKSA”. The building is designed and built to use energy resources, gas, power, water and heat as efficiently and economically as possible. Ventilation equipment, as well as compressors are equipped with recuperation (energy recovery), which is further used for water heating. The entire building and the warehouse and production facilities are equipped with a floor heating system. Facilities for employees have been considered in the building. There are 8 larger and smaller dining areas, as well as environment accessibility for people with reduced mobility has been provided.

Multi-Storey residential complex in Riga, Ranka Dambis 34

Multi-Storey residential complex in Riga, Ranka Dambis 34

Address: Raņķa dambis 34, Rīga
Client: Swallow Residence LLC
General contractor: Velve Ltd.
Сonstruction period: From March 2015 to June 2018
Total area of the object: 14,760 sq. m
100% Complete

The Philosopher's residence is located in a facilitated area of 4,200 square meters, with 120 apartments. The project consists of two apartment buildings (18-storey and 19-storey), which are connected via underground parking for 113 cars.

CONSTRUCTION OF THE TRADE CENTRE “DEPO” IN VILNIUS

CONSTRUCTION OF THE TRADE CENTRE “DEPO” IN VILNIUS

Address: 5 MAKSIMIŠKIU GATVE, VILNIUS
Client: UAB “BUMANI”
General contractor: SIA VELVE
Сonstruction period: JANUARY 2018 – APRIL 2018
Total area of the object: 30 780 M2
100% Complete

Within the project VELVE is providing the construction works of the shopping centre and the surrounding territory. The planned commercial premises together with the complex of the administrative premises form an area of 30 780 m2, while the facilitation works of the territory and infrastructure are planned in an area of 64 979 m2. VELVE provides full implementation of the project – from earthworks, the construction of piles and grillages, masonry, roof, facade finishing and interior works, to the laying of asphalt surfacing for the construction of the traffic tunnel and advertising pylon.

Biofuel boiler plant new construction and dismantling of the existing building

Biofuel boiler plant new construction and dismantling of the existing building

Address: Rencēnu Street 16, Riga
Client: Rīgas BioEnerģija Ltd.
General contractor: Association of persons “PS “VELVE, Moduls-Rīga”, “Axis Technologies”
Сonstruction period: From November 2016 to November 2017
Total area of the object: 11,125 sq. m
Contract sum: 15.5 million EUR
100% Complete

Biofuel power plant at Rencenu Street 16 will be the most powerful biofuel power plant of this kind in Latvia, which will use locally available fuel – wood chips. State-of-the-art equipment installed at this power plant will have high degree of efficiency and automation and this will be the first of two power plants of this kind that are planned to be built in Riga.

REPAIR WORKS AT THE BUILDING COMPLEX OF THE HOUSE OF THE BLACKHEADS

Address: RĀTSLAUKUMS, RIGA
Client: SIA “RĪGAS NAMI”
General contractor: SIA VELVE
Сonstruction period: 10 NOVEMBER 2016 – 31 OCTOBER 2017
100% Complete

During the project VELVE will carry out the repair works of the interior premises at the building complex of the House of the Blackheads, which includes restoration works of the wall painting and floor covering, cosmetic repairs of separate auxiliary premises and common areas, as well as the construction works of engineering systems.

VELVE will also carry out the repair works of the facades of buildings at 6 Rātslaukums and 7 Rātslaukums, including the repairs of decorative elements and sculptures and the restoration of the facade painting.

NATIONAL THEATRE OF LATVIA BUILDING FACADE RECONSTRUCTION

NATIONAL THEATRE OF LATVIA BUILDING FACADE RECONSTRUCTION

Address: KRONVALDA BOULEVARD 2, RIGA
Client: RIGA CITY COUNCIL PROPERTY DEPARTMENT
General contractor: SIA VELVE
Сonstruction period: APRIL 10, 2017 – AUGUST 31, 2017
Total area of the object: 2937,7m2
Contract sum: 376’910 EUR
100% Complete

During the project, VELVE restores the facade painting, as well as sculptures of facade and emblem of the Riga City.

Within the project t of facade restoration, the decorative lightning of the facade will be built.

There will also be a profiled component of the building damage restoration, carrying out the roof, fronton, inter floor ledge, strokes around the windows and window divider, triglift and the pediment gap filling with appropriate restoration of the composition.

Above the building 3rd floor oval windows and risalit windows, there will be updates with vignetting damage gap treatment and the fulfilment with the appropriate restoration composition. For the buildings windows and doors, there will be done an easy repair, replacing faulty parts and restoring the paint.

The terrace of the building will be renovated, eliminating the terrace railing and vases damages, cleaning cracks and filling them with appropriate restoration composition.

Whereas for the terrace floor will be done waterproofing repair and there will be a restore of the installed covering.

SIMPLIFIED RESTORATION WORKS OF THE BUILDING AT 34 BURTNIEKU STREET, RIGA AND FACILITATION OF THE TERRITORY OF RIGA SECONDARY AND ELEMENTARY SCHOOL No. 64

Address: 34 BURTNIEKU STREET, RIGA
Client: RIGA CITY COUNCIL PROPERTY DEPARTMENT
General contractor: SIA VELVE
Сonstruction period: 15 DECEMBER 2016 – 25 AUGUST 2017
100% Complete

Within the project VELVE implemented complete renovation of the existing building, as well as the facilitation work of the entire territory adjacent to the school. During the renovation of the school building, the new design of the school premises was developed and implemented, according to the instructions of the client, and insulating and facade finishing works of the building were also carried out. In all premises of the school indoor finishing works have been provided, including replacement of the floor foundation and covering, the construction of the ceiling, as well as the finishing of the walls. As well as new internal engineering communication systems have been constructed, including water supply, sewerage, heating, ventilation, power supply, security, video surveillance and modern notification system.


New and up-to-date equipment was installed in the kitchen and dining hall of the school, along with the sound and lighting equipment installed in the school’s assembly hall, as well as the hangings required for the hall were provided. New equipment was also installed in the school gym, special floor covering was laid, and acoustic material was installed on the walls and ceilings. All premises of the school were equipped with new furniture.


Facilitation works of the territory include: the construction of a football field with artificial turf, by constructing a base of 1200 m2; the construction of a running track, long jump sector, streetball court with rubber surfacing; the construction of two multifunctional fields for basketball, volleyball, badminton, floorball and other sports with rubber surfacing and limiting structure of the sports fence; as well as the construction of a gymnastics area of soft rubber surfacing and two children’s playgrounds. Spectator seating was also constructed, and roads, fields and walkways were paved in a total area of 4000 m2. Lighting and video surveillance systems were constructed in the entire territory.

NEW BUILDING OF RIGA STRADINS UNIVERSITY STUDENT HOSTEL

NEW BUILDING OF RIGA STRADINS UNIVERSITY STUDENT HOSTEL

Address: 5 DĀRZA STREET, RIGA
Client: RIGA STRADINS UNIVERSITY
General contractor: SIA VELVE
Сonstruction period: DECEMBER 2016 – AUGUST 2017
100% Complete

This will be one of the largest new public building projects of VELVE, which will form a unified training and research complex in the territory of the central building of the University.

The student hostel building will have three floors and an underground floor for the car park. The total floor space of the designed building will be 5400 m2.

There will be 135 rooms in the student hostel, providing the hosting of 220 students, and 32 parking spaces in the territory, as well as 37 additional parking spaces in the basement.

“CONSTRUCTION OF THE STADIUM AND FACILITATION WORKS OF THE TERRITORY USED BY RIGA PLAVNIEKI ELEMENTARY SCHOOL AT 14 JĀŅA GRESTES STREET, RIGA”

Address: 14 GRESTES STREET, RIGA
Client: RIGA CITY COUNCIL PROPERTY DEPARTMENT
General contractor: SIA VELVE
Сonstruction period: 15 MAY 2017 – 25 AUGUST 2017
100% Complete

Within the project VELVE implemented the construction of a school stadium and the facilitation works of the relevant territory.

A football field with artificial turf was constructed in the stadium, with a total of 2840 m2 constructed as the sub-base. Beach volleyball court, equipped gymnastics area with soft rubber surfacing, as well as multifunctional fields for basketball, volleyball, badminton, floorball and other sports were constructed, as well as playgrounds with rubber surfacing and the limiting structure of a sports fence, and equipped children’s playground with soft rubber surfacing were constructed. The design and construction of a multifunctional area for cycling, roller skating, skateboarding with multiple levels of complexity and obstacle maze was provided.

For the convenience of the spectators, renovation of the seating was implemented, as well as the manufacture and installation of modules for the changing rooms and WC was provided, including for people with impaired mobility, for equipment rental and for administration needs.

Along with the facilitation of the territory, paths, benches, waste containers etc. in a total area 1400 m2 have been constructed; parts of roads, car parks and pavements have been paved in a total area of 4000 m2; territory landscaping works of 7000 m2 have been implemented, as well as a lighting and video surveillance system has been constructed in the entire territory.

CIRCUS BUILDING FACADE PRESERVATION

Address: MERKELA STREET 4, RIGA
Client: State LTD. „RĪGAS CIRKS”
General contractor: LTD. VELVE
Сonstruction period: 2017. gada marts – 2017. gada maijs
Total area of the object: 120 kv.m
Contract sum: 6607 EUR
100% Complete

Within the project, VELVE set up temporary metal traces from Merkela street facade on the internal supporting structures, ensuring the stability of the future conservation work to begin.

Reinforcement is carried out with metal ties from the inside, attaching them to the internal partitions.

VEF Culture Palace rebuilding and renovation works

VEF Culture Palace rebuilding and renovation works

Address: Ropažu street 2, Riga
Client: Riga city council property department
General contractor: Velve Ltd.
Сonstruction period: From May 2016
Total area of the object: 6,878 sq. m
Contract sum: 8.97 million eur
100% Complete

On May 2, 2016, at a special ceremony attended by the Minister of Culture Dace Melbarde (Dace Melbārde), the key to VEF Culture Palace was handed over to the VELVE company.

Reconstruction project author: firm “GRAF X”, architect Ruta Kruskopa (Ruta Krūskopa).

Reconstruction of the Building of the Latvian National Theatre

Reconstruction of the Building of the Latvian National Theatre

Address: Kronvalda Blvd. 2, Riga
Client: Riga city council property department
General contractor: Velve
Сonstruction period: From 13 May 2016
Total area of the object: 203.20 sq. m
Contract sum: 525,430.05 EUR
100% Complete

Three storey annex will be built, building area 98.40 square meters, total area of the premises 203.20 square meters.

Annex is intended to provide accessibility (elevator) and construction of new cae premises.

Building permit received on June 10, 2016, mark on implementation of construction works resumption conditions on October 13, 2016.

On October 17, 2016, works on construction site arrangement and external watersupply networks is started, this autumn, until December 1, 2016, pile installation and testing works will be carried out. Works will be resumed with the steel structure footing assembly and construction of concrete slabs.

Building facade - masonry and glass, analogous to the existing annex of the theatre.

Jūrmala Sports Centre

Jūrmala Sports Centre

Address: 55 Raiņa Street, 53 Raiņa Street, Jūrmala
Client: Jūrmala City Council
General contractor: Velve Ltd.
Сonstruction period: From October 2015 to August 2016
Total area of the object: 3,180 sq. m
100% Complete

VELVE carried out the construction of the sports centre and the connecting passage. The hall can host basketball, handball, and volleyball matches, while its primary purpose is to serve as a space for physical education classes for the students of Jūrmala State Gymnasium and "Atvase" primary school.

The Saeima building

The Saeima building

Address: 6/8 Jēkaba Street, Rīga
Client: Saeima Chancellery
General contractor: Velve Ltd.
Сonstruction period: From July 2015 to June 2016
Total area of the object: 2,294 sq. m
100% Complete

VELVE is carrying out the restoration and reconstruction of the Saeima building. The scope of the contract includes the reconstruction of the building, restoration of historic interior elements and structures, and construction of a new extension. The project includes connecting the old building with the new extension (annex). The modern and functional premises will provide meeting spaces, offices, and auxiliary premises for the needs of parliamentary groups.

Conversion of shopping centre into an office building

Conversion of shopping centre into an office building

Address: 3 Tehnikas Street, Rīga Airport, Mārupe Region
Client: NIF Projekts 1 Ltd.
General contractor: Velve Ltd.
Сonstruction period: From 14 March 2015 to April 2016
Total area of the object: 6,400 sq. m
100% Complete

VELVE is carrying out the reconstruction of an office building in Riga Airport.

Construction of Drinking Water Preparation Plant in Baltezers

Construction of Drinking Water Preparation Plant in Baltezers

Address: Garkalne un Ādaži regions
Client: Rīgas Ūdens Ltd.
General contractor: General Partnership Velve - Aqua Seen
Сonstruction period: From February 2014 to November 2015
Total area of the object: 1,283 sq. m
Contract sum: 7.7 million EUR
100% Complete

The main objective of the new drinking water preparation plant is to reduce the content of iron and manganese in the underground water which is supplied to the residents of Riga. This plant processes 28,000 cubic metres of water per day, which amounts to approximately 25% of the total water consumption in the city of Riga. Velve carried out the work as part of the General Partnership VELVE – Aqua Seen together with the Polish company Aqua Seen, which specialises in water deironing technology. The project included the construction of the plant itself and the reconstruction of Baltezers 1 pumping station, as well the construction of utility networks that are connected into a single large automated management system.

Water Management Development in Saurieši Village of Stopiņi Region

Water Management Development in Saurieši Village of Stopiņi Region

Address: Stopiņi region, Saurieši
Client: Stopiņi region municipal agency "Saimnieks"
General contractor: Velve Ltd.
Сonstruction period: From February 2015 to November 2015
100% Complete

The project was implemented with the aim to improve the water management system in the village of Saurieši and provide suitable drinking water and communal sewerage treatment; expanding the accessibility of water supply and sewerage services, reducing the level of infiltration and water loss, as well as reducing the discharge into the environment. The project "Water Management Development in Saurieši Village of Stopiņi Region" is co-financed by the European Union.

Water supply and sewerage networks

Water supply and sewerage networks

Address: Kauguri un Sloka
Client: Jūrmalas Ūdens Ltd.
General contractor: Velve Ltd.
Сonstruction period: From 8 May 2013 to November 2015
100% Complete

Water supply and sewerage network expansion as part of the "Jūrmala Water Management System Development Project, Stage II" project in Kauguri and Sloka; co-financed by the Sloka European Union Cohesion Fund. Construction of more than 15 km of water supply pipes, 13 km of gravity-fed sewerage pipes and two sewage pumping stations for municipal waste water. Construction of a distribution network for individual connections, providing high-quality drinking water and sewerage outlets to the residents using centralised networks and the services of Jūrmalas Ūdens Ltd.

D.K - 16 - reconstruction of the existing sewerage pressure pipes across the Daugava and Laucesa rivers

D.K - 16 - reconstruction of the existing sewerage pressure pipes across the Daugava and Laucesa rivers

Address: Daugavpils
Client: Daugavpils Ūdens Ltd.
General contractor: Velve Ltd.
Сonstruction period: From April 2015 to October 2015
100% Complete

In the object "D.K -16 - reconstruction of the existing sewerage pressure pipes across the Daugava and Laucesa rivers", VELVE carried out the construction and reconstruction of water supply and sewerage pressure pipe networks. The project was implemented as part of the multi-million project "Water Management Development in Daugavpils", co-financed by the EU. Given that water and sewerage tunnels were built under the Daugava and the Laucesa, the entire process was monitored by divers. For each section constructed, pipeline upper end measurements were taken. To ensure continuous operation of the existing sewerage works, the connections were built gradually. Connection of some sections of a tunnel took place underwater, which was carried out by divers.

Workshop building demolition and laboratory building construction at Aizkraukles street 21, Riga

Workshop building demolition and laboratory building construction at Aizkraukles street 21, Riga

Address: Aizkraukles street 21, Riga
Client: Latvian Institute of organic synthesis
General contractor: Velve Ltd.
Сonstruction period: From 24 November 2014 to 29 October 2015
Total area of the object: 1,826.20 sq. m
100% Complete

The newly constructed centre is a research infrastructure of national importance, which was built by attracting EU structural fund financing within the project “The Development of the Research Infrastructure of the Pharmaceutical and Biomedical Research Centre of National Importance ” (agreement No. 2011/0045/2DP/2.1.1.3.1./11/IPIA/VIAA/001).

Research laboratories are located on three floors with total area 1,826 square meters for carrying out top-level researches in pharmacy and medical chemistry.

Development of the centre will provide Latvian researchers with new opportunities for discovering and developing new medicines.

Water and sewerage network reconstruction

Water and sewerage network reconstruction

Address: Pulkveža Brieža Street, Rīga
Client: Rīgas Ūdens Ltd.
General contractor: General Partnership Velve - BGS - Kulk
Сonstruction period: From 6 November 2014 to 19 September 2015
100% Complete

Construction of water pipe using the horizontal directional drilling method beneath the pavement. Reconstruction of sewerage at Ganību Dambis, construction of new mains and a 11.6 l/s pumping station. A total of 636 m of Dn 200 water pipes were built, including 500 m using the trenchless method. The total length of Dn 200 pipelines, including branches, was 1,500 m.

Water and sewerage network construction

Water and sewerage network construction

Address: 1a Kokneses Prospekts, Rīga
Client: Rīgas Ūdens Ltd.
General contractor: General Partnership Velve - BGS - Kulk
Сonstruction period: From 2 February 2015 to 31 August 2015
100% Complete

Construction of water pipe and sewerage under the designed streets to provide infrastructure for the planned residential village. A total of 1,700 m of water pipes and 1,400 m of sewerage networks were built.

Restoration of historical facade of primary school "Valodina"

Restoration of historical facade of primary school "Valodina"

Address: Blaumaņa iela 26, Rīga
Client: Riga City Council Property Department
General contractor: SIA Velve
Сonstruction period: From 16 June 2015 to 21 August 2015
Contract sum: 1,043,035.40 EUR
100% Complete

Historical look of the primary school “Valodiņa” at Blaumana Street has been renovated and now it is a beauty of the whole block.

On 10 March 2016, the object was awarded first place in the category “Façade renovation” of the contest “Latvian Construction Industry's Annual Award 2015".

The renovation works were carried out in accordance with the contract of Renovation and window replacement works at education facilities of Riga municipality.

Reconstruction of main pipe tunnel 2 x DN 450

Reconstruction of main pipe tunnel 2 x DN 450

Address: Mīlgrāvis (Emmas un Ezera streets), Rīga
Client: Rīgas Ūdens Ltd.
General contractor: General Partnership Velve - BGS - Kulk
Сonstruction period: From 13 October 2014 to 11 August 2015
100% Complete

Construction of water supply pipes with Dn 450 using the trenchless method, located under the Mīlgrāvis canal and connected to the main water grid using Dn 800. The two existing metal water pipes are encased in PE outer pipes. The work was carried out using horizontal directional drilling. The total length is ~300 m. The advantage of this method is that it does not damage the pavement or impede the traffic flow.

Water mains reconstruction

Water mains reconstruction

Address: From Mazā Matīsa Street to the intersection of Kalna and Lauvas streets, below the railway tracks, Riga
Client: Rīgas Ūdens Ltd.
General contractor: General Partnership Velve - BGS - Kulk
Сonstruction period: From 22 April 2015
100% Complete

A Dn 800 outer pipe was constructed below the railway hub using the microtunnelling method for subsequent insertion of a Dn 560 PE water pipe. The microtunnelling method ensures precise construction of utilities; it is particularly suitable for difficult environmental conditions, environmentally friendly, and greatly reduces costs thanks to avoiding damage of the surrounding infrastructure.

RTU Faculty of Electronics and Telecommunications, Stage 2

RTU Faculty of Electronics and Telecommunications, Stage 2

Address: 12 Āzenes Street, Rīga
Client: Riga Technical University
General contractor: Velve Ltd.
Сonstruction period: From 22 May 2014 to 12 June 2015
Total area of the object: 7,500 sq. m
100% Complete

VELVE is carrying out the reconstruction of the building. The students' building was rebuilt completely including the reconstruction of the auxiliary roof floor, construction of a small basement floor, reconstruction of the interior, utilities, rain drainage, roofing, replacement of windows and doors, construction of a lift and heat insulation, and decoration of the façade. The reconstruction was carried out according to the technical project by the Architects' Bureau Valeinis un Stepe and the results of topographic and geological engineering research.

Construction of DEPO store at 36 Krasta Street

Construction of DEPO store at 36 Krasta Street

Address: 36 Krasta Street, Rīga
Client: Eirospektrs Ltd.
General contractor: Velve Ltd.
Сonstruction period: From 5 July 2014 to 10 June 2015
Total area of the object: 21,107 sq. m
100% Complete

In this new project, VELVE carried out all construction works and provided construction process management. 21,107 square meters of commercial and office space was built.

Expansion of water supply and sewerage network, System 1 - Grīva 1

Expansion of water supply and sewerage network, System 1 - Grīva 1

Address: Daugavpils
Client: Daugavpils Ūdens Ltd.
General contractor: General Partnership Velve - BGS - Kulk
Сonstruction period: From June 2013 to July 2014
100% Complete

The project tasks included construction and reconstruction of the water supply and municipal sewerage network and restoration of the pavement and lawn. The work was carried out pursuant to the requirements of the FIDIC Red Book.

National Library of Latvia

National Library of Latvia

Address: 3 Mūkusalas street, Rīga
Client: General Partnership Nacionālā Būvkompāniju Apvienība (JSC RBSSKALS (low-voltage networks) and RE&RE Ltd. (electrical installations) two separate contracts
General contractor: Velve Ltd.
Сonstruction period: From June 2009 to June 2014
Total area of the object: 40,455 sq. m
Contract sum: 8,683,235.05 LVL
100% Complete

As part of this project, VELVE constructed the internal electric, lighting, and power networks, as well as automatic fire detection and alarm systems, control and automation systems, smoke control system in the automation parts, data and telephone network infrastructure, audiovisual system infrastructure.

"Rīdze" Elementary School

"Rīdze" Elementary School

Address: 2 Krišjāņa Valdemāra Street, Rīga
Client: Rīga City Council Property Department
General contractor: General Partnership Velve - Moduls Engineering
Сonstruction period: From June 2012 to August 2013
Total area of the object: 3,947 sq. m
100% Complete

As part of the general partnership VELVE - Moduls Engineering, Velve carried out the reconstruction of the "Rīdze" Elementary School building.

The building is located at 2 Krišjāņa Valdemāra Street, in the historic centre of Riga, opposite Riga State Gymnasium No. 2. The building was constructed as a school in 1884 and is a local architectural monument. The project included vertical and horizontal waterproofing and strengthening of the foundation. The patio entrance annexes that were in critical condition and not part of the original building were dismantled and two new glazed staircases conforming to modern usability and fire safety requirements were built instead. The exterior of the building was completely renovated and the roof lantern-attic ventilation outlet was restored, taking into account the research of the original materials used.

The interior underwent functional transformation. Local stair lifts are provided at the first floor stairs for accessibility needs. The area of the school has been reconstructed and improved.

Rīga Gymnasium No. 2

Rīga Gymnasium No. 2

Address: 1 Krišjāņa Valdemāra Street, Rīga
Client: Rīga City Council Property Department
General contractor: General Partnership Velve - Moduls Engineering
Сonstruction period: From November 2007 to August 2009
Total area of the object: 6,300 sq. m
100% Complete

The reconstruction and restoration of Riga Secondary School No. 2 (after reconstruction - Riga City Gymnasium No. 2) was commissioned by the Riga City Council Property Department and carried out by the General Partnership VELVE - Moduls Engineering. Restoration work was started in November 2007. The building was commissioned on 14 August 2009.

The reconstruction work of the school consisted of several stages. It included improvement of external utility networks and construction of internal ones. A bell system and public notification system connected with radio transmission was installed as well. New classrooms equipped with all the required electrical fittings were constructed according to the new planning of the school building.

During restoration, special attention was paid to one of the most challenging tasks - maintaining the historical heritage of the school building.

Vietinghoff House (commercial and residential property)

Vietinghoff House (commercial and residential property)

Address: 2 Vāgnera Street, Rīga
Client: Valērija Barjera Nekustamie Īpašumi Ltd.
General contractor: Velve Ltd.
Сonstruction period: From February 2005 to May 2008
Total area of the object: 3,175 sq. m
100% Complete

VELVE carried out the reconstruction and restoration of the building. During the restoration and reconstruction, special consideration was given to the historical value of Vietinghoff House. The façade of the building underwent complete restoration. The interior, all utilities and intermediate floors were completely rebuilt so that the next residents of the house can enjoy an exclusive living space in the heart of Old Riga and all the modern amenities. The "Vietinghoff House" received two nominations in the 2008 property contest "The Best New Project": 2nd place in the category "The Best Reconstructed Building" and 3rd place in the category "The Best Security Concept".

Reconstruction and construction of the new building of Rīga Graduate School of Law

Reconstruction and construction of the new building of Rīga Graduate School of Law

Address: 13 Alberta street/ 4B Strēlnieku street, Rīga
Client: Rīga Graduate School of Law
General contractor: Velve Ltd.
Сonstruction period: From 2000 to December 2001
Total area of the object: 7,682 sq. m
100% Complete

In restoration of this eclectically decorative Art-Nouveau masterpiece created by Mikhail Eisenstein, special attention was paid to the authentic restoration of wall and ceiling decorations, as well as sculptural decors on the main façade. The roof was covered with specially aged titanium and zinc sheets instead of the usual tin. An important addition to the building is the seven-floor glazed annex in the inner courtyard and the glass gallery which houses classrooms and a library.

Bank of Latvia repository

Bank of Latvia repository

Address: 3 Bezdelīgu street, Rīga
Client: The Bank of Latvia
General contractor: Limited Partnership E. Heitkamp, Kalnozols, BKD, Velve
Сonstruction period: From July 1999 to November 2001
Total area of the object: 8,000 sq. m
100% Complete

VELVE carried out the management of all construction work and took part in the construction of the building as part of the Limited Partnership E.Heitkamp, Kalnozols, BKD, VELVE.

A special challenge for the limited partnership was the construction of the cash depository and compliance with the security requirements for load-bearing and partitioning structures that are imposed by the national bank and the extensive utility network. Specially designed fire- and explosion-proof doors have not stopped the façade designers from creating a sensation of openness, which is a great characterisation of this modern piece of architecture.

Jēkaba kazarmas

Jēkaba kazarmas

Address: 4 Torņa street
Client: InterSource Baltic
General contractor: Velve Ltd.
Сonstruction period: From March 1995 to April 1997
Total area of the object: 9,000 sq. m
100% Complete

The huge army barracks were built in the XVIII century after the Great Northern War. Before the start of reconstruction and rebuilding in 1994, VELVE made the biggest contribution by strengthening the building foundation with drilled piles and a concrete "belt". The steep roof was restored according to early drawings. With an area of 9,000 square metres, Jēkaba Kazarmas is one of the largest reconstruction projects in Latvia that today has become an interesting office, restaurant, and shopping centre.

icon